Please use this identifier to cite or link to this item: https://ir.iimcal.ac.in:8443/jspui/handle/123456789/3320
Title: Evaluating the greenness of hydroelectric projects of Northeast India: a study with special reference to the Tipaimukh project
Authors: Choudhury, Nazrana Begam
Choudhury, Soma Roy Dey
Keywords: Carbon dioxide
Climate change
Dam
Greenhouse gas
Methane
Nitrous oxide
Issue Date: Sep-2020
Publisher: Indian Institute of Management Calcutta, Kolkata
Series/Report no.: Vol.47;No.3
Abstract: Urbanization, industrialization and human population explosion not only increased the global power demand, but also led to global warming, pollution and climate change. This encouraged production of power from renewable sources, and thus, hydropower development has been focused. Today, there is more than 1300 GW of installed hydropower across the world, and most of the hydroelectric projects (HEPs) are multi-purpose which includes irrigation, flood and drought mitigation and tourism. Although credited as cheap, clean and green, recent studies demonstrate that the reservoirs of HEPs produce enormous quantities of greenhouse gases (GHGs), including carbon dioxide (CO2), methane (CH4) and nitrous oxide (N2O). A large number of estimates on the amount of GHGs from HEPs are available from across the globe. India is next only to USA and China in terms of number of large dams, and thousands of new dams are being planned or constructed, especially in the northeastern part. However, none of these projects have been analyzed in terms of production of GHGs, which is an essential prerequisite for developing such projects and to determine whether carbon emission reduction credits can be accorded or not. The present study was conducted to determine greenness of some of the HEPs of Northeast India in terms of emission of GHGs, and eligibility of the projects for carbon emission reduction credits. Further, the emission of different GHGs through various processes from the Tipaimukh HEP (Manipur) was estimated. In view of the findings, we have provided recommendations, which may be helpful in decision-making process.
Description: Nazrana Begam Choudhury & Soma Roy Dey Choudhury, Department of Commerce, Assam University, Silchar, Assam, 788011, India
p.293-302
Issue Editor – Manisha Chakrabarty
URI: https://doi.org/10.1007/s40622-020-00251-9
https://ir.iimcal.ac.in:8443/jspui/handle/123456789/3320
ISSN: 0304-0941 (print version) ; 2197-1722 (electronic version)
Appears in Collections:Issue 3, September 2020

Files in This Item:
File SizeFormat 
Evaluating the greenness of hydroelectric projects.pdf
  Until 2027-03-31
279.7 kBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.