Please use this identifier to cite or link to this item: https://ir.iimcal.ac.in:8443/jspui/handle/123456789/1242
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMitra, Subrata
dc.contributor.authorAvittathur, Balram
dc.date.accessioned2021-08-26T06:05:20Z-
dc.date.available2021-08-26T06:05:20Z-
dc.date.issued2018
dc.identifier.urihttps://link.springer.com/article/10.1007/s40622-018-0184-x
dc.identifier.urihttps://ir.iimcal.ac.in:8443/jspui/handle/123456789/1242-
dc.descriptionSubrata Mitra, Department of Operations Management, Indian Institute of Management Calcutta, Kolkata; Balram Avittathur, Department of Operations Management, Indian Institute of Management Calcutta, Kolkata
dc.descriptionpp.207-224
dc.descriptionDOI - https://doi.org/10.1007/s40622-018-0184-x
dc.description.abstractIn this paper, an application of linear programming in optimizing the procurement and movement of coal for an Indian coal-fired thermal power-generating company is presented. Results show that there is immense potential not only for significant cost savings but also for reduced logistics between different coal source�power plant pairs. The target plant load factor at each power plant can be achieved without the need of any imported coal which would not only save precious foreign exchange, but also reduce the logistics involved in the import of coal and transport to power plants. Sensitivity analyses have also been performed with varying coal supply and coal quality levels. The issue of greenhouse gas (GHG) emissions from coal-fired power plants has also been addressed. The trade-off between the optimal total cost and GHG emission targets has been explored. Results show that it is possible to significantly reduce carbon footprints with a marginal increase in the optimal total cost and without the need of import of coal. However, if it is desired to further reduce GHG emission targets, optimal total costs rise substantially with imported coal gradually substituting domestic coal. It is believed that the results presented in this paper would provide a fresh perspective with regard to the allocation and movement of coal. Finally, recommendations and concluding remarks are presented.
dc.publisherAR-IIMC
dc.publisherDecision
dc.publisherSpringer
dc.relation.ispartofseries45(3)
dc.subjectLinear programming
dc.subjectCoal-fired power plant
dc.subjectCoal allocation
dc.subjectCoal movement
dc.subjectGreenhouse gas emission
dc.titleApplication of linear programming in optimizing the procurement and movement of coal for an Indian coal-fired power-generating company
dc.typeArticle
Appears in Collections:Operations Management

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.