Please use this identifier to cite or link to this item: https://ir.iimcal.ac.in:8443/jspui/handle/123456789/1208
Full metadata record
DC FieldValueLanguage
dc.contributor.authorDatta, Partha Priya
dc.contributor.authorSrivastava, Anupam
dc.contributor.authorRoy, Rajkumar
dc.date.accessioned2021-08-26T06:05:19Z-
dc.date.available2021-08-26T06:05:19Z-
dc.date.issued2013
dc.identifier.urihttps://www.scopus.com/inward/record.uri?eid=2-s2.0-84876671331&doi=10.1016%2fj.compind.2013.02.011&partnerID=40&md5=3971a766daeba9866b882ea43bca30db
dc.identifier.urihttps://ir.iimcal.ac.in:8443/jspui/handle/123456789/1208-
dc.descriptionDatta, Partha Priya, Operations Management Group, Indian Institute of Management, Calcutta, India; Srivastava, Anupam, Aircraft Division, Hindustan Aeronautics Limited, Nasik, Maharashtra, India; Roy, Rajkumar, Manufacturing Department, Cranfield University, Cranfield, United Kingdom
dc.descriptionISSN/ISBN - 01663615
dc.descriptionpp.543-555
dc.descriptionDOI - 10.1016/j.compind.2013.02.011
dc.description.abstractA major shift in support and maintenance logistics for complex engineering systems over the past few years has been observed in defence and aerospace industry. Availability contracting, a novel approach in this area and a special type of performance based contract, is replacing traditional service procurement practices. The service provider is measured against an equipment availability target set by the customer and rewarded on savings achieved. The performance of such contracts depends on proper utilization of right mix of labour resources. Contemporary literature on resource modelling has not attempted at modelling the entire aircraft maintenance line along with the labour resources. This research work aims to improve resource utilization in availability type contracts by simulating human resources and processes in an aircraft maintenance line. � 2013 Elsevier B.V.
dc.publisherSCOPUS
dc.publisherComputers in Industry
dc.relation.ispartofseries64(5)
dc.subjectIndustrial service
dc.subjectResource modeling
dc.subjectSimulation
dc.titleA simulation study on maintainer resource utilization of a fast jet aircraft maintenance line under availability contract
dc.typeArticle
Appears in Collections:Operations Management

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.