Title: | A heuristic method for RCPSP with fuzzy activity times |
Authors: | Bhaskar, Tarun Pal, Manabendra N. Pal, Asim Kumar |
Keywords: | Critical path Fuzzy number Project scheduling Time |
Issue Date: | 2011 |
Publisher: | SCOPUS European Journal of Operational Research |
Series/Report no.: | 208(1) |
Abstract: | In this paper, we propose a heuristic method for resource constrained project scheduling problem with fuzzy activity times. This method is based on priority rule for parallel schedule generation scheme. Calculation of critical path in this case requires comparison of fuzzy numbers. Distance based ranking of fuzzy number is used for finding the critical path length and concept of shifting criticality is proposed for some of the special cases. We also propose a measure for finding the non-integer power of a fuzzy number. We discuss some properties of the proposed method. We use an example to illustrate the method. � 2010 Elsevier B.V. All rights reserved. |
Description: | Bhaskar, Tarun, Computing and Decision Sciences Lab, GE India Technology Centre, Bangalore, India; Pal, Manabendra N., Indian Institute of Management Calcutta, Kolkata 700104, India; Pal, Asim Kumar, Indian Institute of Management Calcutta, Kolkata 700104, India ISSN/ISBN - 03772217 pp.57-66 DOI - 10.1016/j.ejor.2010.07.021 |
URI: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-78649450738&doi=10.1016%2fj.ejor.2010.07.021&partnerID=40&md5=30c81267cdcf8dc3b4bea3b4cedbca03 https://ir.iimcal.ac.in:8443/jspui/handle/123456789/1113 |
Appears in Collections: | Management Information Systems |
Files in This Item:
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.